The following specifications should be used in for the proper application of the SUNLIFE Roofing System™. Failure to properly follow the specifications will jeopardize the quality of the installation leading to warranty problems in the future. Shortcuts to save labor time now will cost you warranty time, materials, and labor later.

METAL ROOF SPECIFICATIONS:

1. Tighten all loose fasteners and replace missing fasteners. Oversized ones may be needed.


2. Clean area thoroughly using SSPC hand cleaning followed by a wash coat or pressure wash.


3. Prime all rusty areas with SUNLIFE "Direct to Rust" metal primer.


4. At all joints, seams, and protrusions, apply a "butter coat" Sunlife Roofing Compound with Rust Inhibitor.


5. Into the wet material, embed flexible mat broomed so as to conform to the surrounding contour.


6. Apply top dressing SUNLIFE Roofing Compound with Rust Inhibitor to all joints and protrusions.


7. Apply one (1) coat SUNLIFE Roofing Compound with Inhibitor to the entire roof surface at a rate of one (1) gallon per square. Material may be sprayed, brushed, or rolled. In the event that there are screw heads or nails present, brooming is preferred.


8. Apply second coat SUNLIFE Roofing Compound with Inhibitor at a rate of one (1) gallon per square.

option

|Built-up| |Metal| |Singleply| |Universal| |Wet| |US Applicators| |Warranty|

This site is best viewed with Netscape Navigator 4.7 or Microsoft Explorer 4.5

  Sunlife Systems International, Inc.
5301 Nations Crossing Road
Charlotte, NC 28217
(800) 328-5885
Tel: (704) 527-2480
Fax: (704) 527-0534

© 2006 Sunlife Systems International, Inc.

All rights reserved.

Do not duplicate or redistribute in any form.